CARBON STEEL WELDING, PIPES AND STEEL STRUCTURE
Project Name: Dubai Land Chilled Water Network Phase 1
Client: EMPOWER
Main Contractor: Amana Pipeline Construction L.L.C
Status: Completed
Scope of Work: Chilled water network mechanical installation works, Pipe-laying (from trench premises into the trench), pipe fit-up, alignment, welding, and field joint insulation of 15,000 inch/Dia
Project Name: MBR-Dubai Hills Estate Development Chilled Water Network Phase 1
Client: EMAAR
Main Contractor: Amana Pipeline Construction L.L.C
Status: Completed
Scope of Work: Chilled water network mechanical installation works, Pipe-laying (from trench premises into the trench), pipe fit-up, alignment, welding, and field joint insulation of 85,000 inch/Dia
Project Name: Al Khail Avenue Chilled water network
Client: Nakheel
Main Contractor: Dhabi Contracting L.L.C
Status: Completed
Scope of Work: Chilled water network mechanical installation works, Pipe-laying (from trench premises into the trench), pipe fit-up, alignment, welding, and field joint insulation of 3,500 inch/Dia
Project Name: MAG Creek Well Being Resort
Client: MAG Property development
Main Contractor: Middle East Tech. Mech. Const. Fix. L.L.C
Status: Completed
Scope of Work: Chilled water network mechanical installation works, Pipe-laying pipe fit-up, alignment, welding, field joint insulation, cold insulation, cladding, testing and commissioning of
5,000 inch/Dia
Project Name: Construction, Completion and Maintenance, in the Defects Liability Period, of Semi-Permanent Plant (DWD SPP 1) and extend the existing Chilled Water Piping Network at Deira Waterfront
Client: EMPOWER
Contractor: BIN LAHEJ ELECTROMECHANICAL L.L.C
Status: Completed
Scope of Work: Pipe laying, alignment, pipe fit- up, welding and insulation as per std. EMPOWER specs, including network piping, BVP-1 and NVP-1.
Project Name: P-130 District Cooling Scheme DM-06 NAKHEEL HARBOR Station Connection to TABREED DM-06 CWN Network
Client: TABREED
Contractor: Taurus General Contracting
Status: Completed
Scope of Work: ETS room mechanical piping: Complete mechanical installation including piping fit-up and welding, butterfly valves and flow meters, connection to the HEX, insulation for all chilled water piping system inside the ETS as per the drawings.
ETS room cladding works: Supply and installation of aluminum cladding (0.7 mm thk.) for the piping system inside the ETS as per the drawings
Project Name: Dubio Tech Phase 2 Extension- Chilled Water network
Client: Empower
Main Contractor: Overseas AST
Status: Completed
Scope of Work: Chilled water network mechanical installation works, Pipe-laying pipe fit-up, alignment, welding, and field joint insulation of 20,000 inch/Dia.
Project Name: Mechanical Works at ETS room of plot no. E40-C28, Danet Development (PR19-122)
Client: PAL COOLING HOLDING L.L.C
Status: Completed
Project Name: Mechanical Works @ Al Kifaf Development Chilled Water Piping Work in Chiller Room
Client: EMPOWER
Contractor: Bin Lahej Electromechanical L.L.C
Status: Completed
Scope of Work: Complete mechanical CHW piping installation including piping works (pre-fab, supports fabrication, erection, fitup and welding (TIG) including all strainers, gauges, BFV’s etc. as per the drawings.
Project Name: Mechanical Piping Works @ REEM MALL
ETS ROOMS
Client: UPAC/NREC
Contractor: Itinera SPA and Ghantoot Transport & General Contracting LLC Joint Venture.
Status: Completed
Scope of Work: Complete mechanical Chilled water piping installation including piping works (pre-fab, supports fabrication, erection, fitup and welding (TIG) including all strainers, gauges, BFV’s etc. as per the drawings.
Project Name: GARDENIA RESIDENCE, SECTOR - RC1/10,6311103, HADAEQ SHEIKH MOHAMMED BIN RASHID, DUBAI, UAE
Client: Al Ansari Real Estate Development
Contractor: Building Co. Best L.L.C.
Status: Ongoing
Scope of Work: ETS room: Complete mechanical, electrical and instrumentation supply and installation including piping fitup and welding, butterfly valves and flow meters, installation of HEX, pressure testing, flushing and chemical cleaning connection to the HEX, insulation and cladding and PLC connection, integration with central and commissioning for all chilled water primary piping system inside the ETS as per the drawings and EMAAR specs.
Project Name: One Zabeel (ETS & Pump Rooms
Secondary Piping)
Client: ICD
Main Contractor: ALEC ENGINEERING AND CONTRACTING LLC
MEP Contractor: SPECON L.L.C
Status: Ongoing
Scope of Work: Complete mechanical installation including piping fit-up and welding, butterfly valves and flow meters, strainers, supports, vents, drains, all connections to the pumps and heat exchangers, testing for all chilled water secondary piping system inside the ETS room and 3 no. pump rooms.
Project Name: Water Transmission Scheme from Madinat Zayed to Liwa & Qusahwira
Client: Abu Dhabi Transmission & Despatch Company (TRANSCO)
Main Contractor: SOCIETE EGYPTIENNE D'ENTREPRISES (SEDE)
Status: Completed
Scope of Work: Water network mechanical installation works, Pipe-laying (from trench premises into the trench), pipe fit-up, alignment, and welding
Project Name: OPERA GRAND TOWER
Client: EMAAR
MEP Contractor: Reliance Contracting Company WLL
Status: On-Going
Scope of Work: Supply, Fabrication & Installation of Aluminium Cladding for Duct and chilled water piping.
Project Name: CAMP ABU DHABI
Client: EMAAR
MEP Contractor: James L Williams Middle East
Status: Completed
Scope of Work: Supply, installation and testing the chilled water network.
.
Project Name: Sea World, Abu Dhabi
Client: MIRAL
Main Contractor: ALEC ENGINEERING AND CONTRACTING LLC
MEP Contractor: AL SHAFR
Status: Completed
Scope of Work: Chilled water piping, installation including all fittings, joint welds, threads, supports, and hangers, isolating valves and pressure testing.
Project Name: Za’abeel-I District Cooling Project (EMP-59-TR302, Dubai
Client: Empower Energy Solutions
Main Contractor: AG Engineering LLC
MEP Contractor: AG Engineering LLC
Status: Completed
Scope of Work: Installation for Chilled Water Piping Works, Valves, Insulation, supports & equipment.
Project Name: 167W2020 TRANSMISSION PIPELINES- 2XDN1800CS from UAQ New 150MIGD RO plant to Khuraijah New WDC- RAK Project
Client: Federal Electricity and Water Authority
Main Contractor: Tecton Engineering & Construction LLC
Status: Completed
Scope of Work: Pipe alignment, pipe fit up, welding and field joints sand blasting, external epoxy coating and heat shrink sleeve.
Project Name: FOT-VLCCC CONNECTIVITY
Client: Fujairah Oil Terminal FZC
Main Contractor: AL BANNA ENGINEERING
Status: On-Going
Scope of Work: Underground pipeline corridor works (Civil & Mechanical Works)
Project Name: Supply and Installation of Steel Structure and MEP Work (Conrad Abu Dhabi)
Client: Green Container Advance Farming LLC
Main Contractor: Aligned Technical Services LLC
Status: Completed
Scope of Work: Supply and Installation of Steel Structure and MEP Work (Conrad Abu Dhabi)
Project Name: Supply and Installation of Steel Structure and MEP Work (Al Ain Abu Dhabi)
Client: Green Container Advance Farming LLC
Main Contractor: Aligned Technical Services LLC
Status: Completed
Scope of Work: Supply and Installation of Steel Structure and MEP Work (Al Ain Abu Dhabi
Project Name: Supply and Installation of Steel Structure and MEP Work (Nikki Beach)
Client: Green Container Advance Farming LLC
Main Contractor:
Status: On-Going
Scope of Work: Supply and Installation of Steel Structure and MEP Work (Nikki Beach)
Project Name: Supply and Installation of Steel Structure and MEP Work (Ritz Carlton)
Client: Green Container Advance Farming LLC
Main Contractor: Aligned Technical Services LLC
Status: On-Going
Scope of Work: Supply and Installation of Steel Structure and MEP Work (Ritz Carlton)
Project Name: Supply and Installation of Steel Structure and MEP Work (Westin Mina Seyahi)
Client: Green Container Advance Farming LLC
Main Contractor: Aligned Technical Services LLC
Status: On-Going
Scope of Work: Supply and Installation of Steel Structure and MEP Work (Westin Mina Seyahi)
Project Name: AWMW6-NEW Utilities Service Corridor and Associated Work
Client: Sharjah Airport
Main Contractor: Binladin Contracting
Consultant: Sharjah International Airport Expansion Program
Status: On-Going
Scope of Work: Chilled Water Network
Project Name: DLRC District Cooling Plant Dubai-Dubai Land-UAE
Client: EMPOWER
Consultant: Allied Consultants LTD
Main Contractor: Steel Construction Engineering Co LLC
Status: On-Going
Scope of Work: Insulation and Cladding Works