top of page
aligned final logo for use.png

CARBON STEEL WELDING, PIPES AND STEEL STRUCTURE

Project Name: Dubai Land Chilled Water Network Phase 1

Client: EMPOWER

Main Contractor: Amana Pipeline Construction L.L.C

Status: Completed

 

Scope of Work: Chilled water network mechanical installation works, Pipe-laying (from trench premises into the trench), pipe fit-up, alignment, welding, and field joint insulation of 15,000 inch/Dia

 

Project Name: MBR-Dubai Hills Estate Development Chilled Water Network Phase 1

Client: EMAAR

Main Contractor: Amana Pipeline Construction L.L.C

Status: Completed

 

Scope of Work: Chilled water network mechanical installation works, Pipe-laying (from trench premises into the trench), pipe fit-up, alignment, welding, and field joint insulation of 85,000 inch/Dia

 

Project Name: Al Khail Avenue Chilled water network

Client: Nakheel

Main Contractor: Dhabi Contracting L.L.C

Status: Completed

 

Scope of Work: Chilled water network mechanical installation works, Pipe-laying (from trench premises into the trench), pipe fit-up, alignment, welding, and field joint insulation of 3,500 inch/Dia

Project Name: MAG Creek Well Being Resort

Client: MAG Property development

Main Contractor: Middle East Tech. Mech. Const. Fix. L.L.C

Status: Completed

Scope of Work: Chilled water network mechanical installation works, Pipe-laying pipe fit-up, alignment, welding, field joint insulation, cold insulation, cladding, testing and commissioning of

5,000 inch/Dia

Project Name: Construction, Completion and Maintenance, in the Defects Liability Period, of Semi-Permanent Plant (DWD SPP 1) and extend the existing Chilled Water Piping Network at Deira Waterfront 

Client: EMPOWER

Contractor: BIN LAHEJ ELECTROMECHANICAL L.L.C

Status: Completed

 

Scope of Work: Pipe laying, alignment, pipe fit- up, welding and insulation as per std. EMPOWER specs, including network piping, BVP-1 and NVP-1.

 

Project Name: P-130 District Cooling Scheme DM-06 NAKHEEL HARBOR Station Connection to TABREED DM-06 CWN Network

Client: TABREED

Contractor: Taurus General Contracting

Status: Completed

 

Scope of Work: ETS room mechanical piping: Complete mechanical installation including piping fit-up and welding, butterfly valves and flow meters, connection to the HEX, insulation for all chilled water piping system inside the ETS as per the drawings.

ETS room cladding works: Supply and installation of aluminum cladding (0.7 mm thk.) for the piping system inside the ETS as per the drawings

Project Name: Dubio Tech Phase 2 Extension- Chilled Water network

Client: Empower

Main Contractor: Overseas AST

Status: Completed

 

Scope of Work: Chilled water network mechanical installation works, Pipe-laying pipe fit-up, alignment, welding, and field joint insulation of 20,000 inch/Dia.

Project Name: Mechanical Works at ETS room of plot no. E40-C28, Danet Development (PR19-122)

Client: PAL COOLING HOLDING L.L.C

Status: Completed

Project Name: Mechanical Works @ Al Kifaf Development Chilled Water Piping Work in Chiller Room

Client: EMPOWER

Contractor: Bin Lahej Electromechanical L.L.C

Status: Completed

 

Scope of Work: Complete mechanical CHW piping installation including piping works (pre-fab, supports fabrication, erection, fitup and welding (TIG) including all strainers, gauges, BFV’s etc. as per the drawings.

Project Name: Mechanical Piping Works @ REEM MALL

ETS ROOMS

Client: UPAC/NREC

Contractor: Itinera SPA and Ghantoot Transport & General Contracting LLC Joint Venture.

Status: Completed

 

Scope of Work: Complete mechanical Chilled water piping installation including piping works (pre-fab, supports fabrication, erection, fitup and welding (TIG) including all strainers, gauges, BFV’s etc. as per the drawings.

Project Name: GARDENIA RESIDENCE, SECTOR - RC1/10,6311103, HADAEQ SHEIKH MOHAMMED BIN RASHID, DUBAI, UAE

 

Client: Al Ansari Real Estate Development

Contractor: Building Co. Best L.L.C.

Status: Ongoing

 

Scope of Work: ETS room: Complete mechanical, electrical and instrumentation supply and installation including piping fitup and welding, butterfly valves and flow meters, installation of HEX, pressure testing, flushing and chemical cleaning connection to the HEX, insulation and cladding and PLC connection, integration with central and commissioning for all chilled water primary piping system inside the ETS as per the drawings and EMAAR specs.

Project Name: One Zabeel (ETS & Pump Rooms

Secondary Piping) 

Client: ICD

Main Contractor: ALEC ENGINEERING AND CONTRACTING LLC

MEP Contractor: SPECON L.L.C

Status: Ongoing

Scope of Work: Complete mechanical installation including piping fit-up and welding, butterfly valves and flow meters, strainers, supports, vents, drains, all connections to the pumps and heat exchangers, testing for all chilled water secondary piping system inside the ETS room and 3 no. pump rooms.

Project Name: Water Transmission Scheme from Madinat Zayed to Liwa & Qusahwira 

Client: Abu Dhabi Transmission & Despatch Company (TRANSCO)

Main Contractor: SOCIETE EGYPTIENNE D'ENTREPRISES (SEDE)

Status: Completed

Scope of Work: Water network mechanical installation works, Pipe-laying (from trench premises into the trench), pipe fit-up, alignment, and welding

Project Name: OPERA GRAND TOWER

Client: EMAAR

MEP Contractor: Reliance Contracting Company WLL

Status: On-Going

 

Scope of Work: Supply, Fabrication & Installation of Aluminium Cladding for Duct and chilled water piping.

Project Name: CAMP ABU DHABI

Client: EMAAR

MEP Contractor: James L Williams Middle East

Status: Completed

 

Scope of Work: Supply, installation and testing the chilled water network.

.

Project Name: Sea World, Abu Dhabi

Client: MIRAL

Main Contractor: ALEC ENGINEERING AND CONTRACTING LLC

MEP Contractor: AL SHAFR

Status: Completed

 

Scope of Work: Chilled water piping, installation including all fittings, joint welds, threads, supports, and hangers, isolating valves and pressure testing.

Project Name: Za’abeel-I District Cooling Project (EMP-59-TR302, Dubai

Client: Empower Energy Solutions

Main Contractor: AG Engineering LLC

MEP Contractor: AG Engineering LLC

Status: Completed

 

Scope of Work: Installation for Chilled Water Piping Works, Valves, Insulation, supports & equipment.

 

Project Name: 167W2020 TRANSMISSION PIPELINES- 2XDN1800CS from UAQ New 150MIGD RO plant to Khuraijah New WDC- RAK Project

Client: Federal Electricity and Water Authority

Main Contractor: Tecton Engineering & Construction LLC

Status: Completed

 

Scope of Work: Pipe alignment, pipe fit up, welding and field joints sand blasting, external epoxy coating and heat shrink sleeve.
 

Project Name: FOT-VLCCC CONNECTIVITY

Client: Fujairah Oil Terminal FZC

Main Contractor: AL BANNA ENGINEERING

Status: On-Going

 

Scope of Work: Underground pipeline corridor works (Civil & Mechanical Works)

Project Name: Supply and Installation of Steel Structure and MEP Work (Conrad Abu Dhabi)

Client: Green Container Advance Farming LLC

Main Contractor: Aligned Technical Services LLC

Status: Completed

 

Scope of Work: Supply and Installation of Steel Structure and MEP Work (Conrad Abu Dhabi)

 

Project Name: Supply and Installation of Steel Structure and MEP Work (Al Ain Abu Dhabi)

Client: Green Container Advance Farming LLC

Main Contractor: Aligned Technical Services LLC

Status: Completed

 

Scope of Work: Supply and Installation of Steel Structure and MEP Work (Al Ain Abu Dhabi

 

Project Name: Supply and Installation of Steel Structure and MEP Work (Nikki Beach)

Client: Green Container Advance Farming LLC

Main Contractor:

Status: On-Going

 

Scope of Work: Supply and Installation of Steel Structure and MEP Work (Nikki Beach)

 

Project Name: Supply and Installation of Steel Structure and MEP Work (Ritz Carlton)

Client: Green Container Advance Farming LLC

Main Contractor: Aligned Technical Services LLC

Status: On-Going

 

Scope of Work: Supply and Installation of Steel Structure and MEP Work (Ritz Carlton)

 

Project Name: Supply and Installation of Steel Structure and MEP Work (Westin Mina Seyahi)

Client: Green Container Advance Farming LLC

Main Contractor: Aligned Technical Services LLC

Status: On-Going

 

Scope of Work: Supply and Installation of Steel Structure and MEP Work (Westin Mina Seyahi)

 

Project Name: AWMW6-NEW Utilities Service Corridor and Associated Work

Client: Sharjah Airport

Main Contractor: Binladin Contracting

Consultant: Sharjah International Airport Expansion Program

Status: On-Going

 

Scope of Work: Chilled Water Network

 

Project Name: DLRC District Cooling Plant Dubai-Dubai Land-UAE

Client: EMPOWER

Consultant: Allied Consultants LTD

Main Contractor: Steel Construction Engineering Co LLC

Status: On-Going

 

Scope of Work: Insulation and Cladding Works

bottom of page